Utility Engineering Services

References - Thielsch Engineering invites you to contact any of these fine companies to learn more about  how we do business.  Providing our clients with the best return on their investment is our goal.

ALLIANT ENERGY Columbia & Burlington Station

  • Nondestructive Examination on Critical Piping Systems 1999

  • Ultrasonic Examination of Hydrogen Damaged Waterwall Tube 2000

  • Coal Piping Inspection 2000

  • Main Steam, Hot Reheat Piping, Feedwater Piping, and Deaerator Heater & Storage Tank Inspection 2000.

CITY OF AUSTIN Decker & Holly Street Station 

  • Nondestructive Examination and Repair Welding of the Deaerator Heater and Storage Tank 1993 through 2002

  • Deaerators, Superheater Headers, Reheater, Piping, Fans, Forced Draft, Condensers, Feedwater Heaters Reliability Improvement Program 1995 through 2002

  • Eddy Current Examination and Condition Assessment of Main Condenser 1996

  • Nondestructive Examinations and Metallurgical Evaluation of Generator Retaining Rings for Integrity and Suitability for Continued Service 1997

  • Integrity and Condition Assessment of Steam Drum, Deaerator Heater and Storage Tank, No. 13 Feedwater Heater, Air Preheater, Rotor Post, Superheater/Desuperheater Nozzles, and Reheat Outlet and Secondary Superheater Outlet Headers 1998.

HOOSIER ENERGY R.E.C. INC. Ratts & Merom Generating Station

  • Oxide Scale Thickness Measurements, Superheater and Reheater Tubing 1990 through 2002

  • Examination of 2-1/4 Cr - 1 Mo Low-Alloy Steel Superheater Tube Samples and Considerations of Suitability for Continued Service 1996 through 2001

  • Nondestructive Examinations and Engineering Evaluations of 155 ft. of Seam Welded Hot Reheat Piping 1995

  • Nondestructive Examination and Engineering Evaluation of Hot Reheat Piping System and Flow Accelerated Corrosion / Wall Thickness Survey of Boiler Feedwater Piping 1999

  • Examination of Failed Superheater Tubes Attributed to Long- and Short-Term Overheating 1998 through 2001

  • Integrity and Condition Assessment of Critical Boiler Components and Auxiliary Equipment 2001.

For more information contact:
Peter Kennefick, Vice President
Tel: (401) 467-6454
Fax: (401) 461-6006
E-mail: pkennefick@thielsch.com


Thielsch Engineering Home

Back